null

Qumy Leather Dog Leash 6Ft, Heavy Duty Dog Training Leash For Large And Medium Dogs, Soft And Strong Genuine Leather Braided Handmade Long Lead Leash For Dog Training, Brown

Qumy
No reviews yet Write a Review
MRP: ₹7,673.00
Price: ₹5,902.00
Sale 23%
UPC:
8.32929E+12
In Stock
Availability: Estimated time of delivery is 15-17 days
Current Stock:Only left:

Frequently Bought Together:

Total: Inc. Tax
Total: Ex. Tax

Description

QUMY Leather Dog Leash 6ft, Heavy Duty Dog Training Leash for Large and Medium Dogs, Soft and Strong Genuine Leather Braided Handmade Long Lead Leash for Dog Training, Brown

Key Features:
• Braided Leather Dog Leash: Made of soft and durable 100% premium top layer cowhide leather which is made of a single piece of leather, can provide your dog with maximum comforts. The professional strong dog leash has two-part twisted knot braided by handwork which can greatly relieve the impact of the dog when sprinting, looks fashionable and beautiful.
• Soft Handle and Pure Copper Hook: The heavy-duty dog leash is made of full solid brass swivel hook with strong tensile resistance. 360 rotation sturdy hook will prevent your dog lead leash from twisting, and can be easily tied to a dog collar or chest strap. The super soft handle can prevent the burning hands feeling when the dog pulls hard. Experience peace of mind and safety during every walk with your dogs.
• Perfect Size: 6 foot ×3/4 inch. The 6ft braided leather dog leash is idea for dog training, daily walking, running, travel and outdoor. The long lead leath can help you to effectively restrain your dog's behavior when walking on the street or in the yard. This tactical dog leash is also the perfect length for training process period.

Country of Origin: USA
Manufacturer/Importer/Packed By:‎ QUMY

Estimated time of delivery is 15-17 days
Delivery Region :‎ All over India

Product Reviews

No reviews yet Write a Review