null

Long Leash Waterproof Training,Heavy Duty Recall Long Lead,Durable Outdoor Dog Leash 5Ft 10Ft 20Ft 30Ft Great For Training,Beach,Tie Out,Yard,Play,Camping

Tockfit
No reviews yet Write a Review
MRP: ₹4,610.00
Price: ₹4,008.00
Sale 13%
UPC:
8.32925E+12
In Stock
Availability: Estimated time of delivery is 15-17 days
Current Stock:Only left:

Frequently Bought Together:

Total: Inc. Tax
Total: Ex. Tax

Description

Long Leash Waterproof Training,Heavy Duty Recall Long Lead,Durable Outdoor Dog Leash 5FT 10FT 20FT 30FT Great for Training,Beach,Tie Out,Yard,Play,Camping

Key Features:
• STRONG AND DURABLE: The improved leash is made of polyvinyl chloride material and polyester fiber,tensile strength is strong enough to withstand 60 pounds of pulling force,and the joints are strong enough not to come off easily.The training leash is not a bite-proof material and is not suitable for tying
• PREVENT TANGLING: Dog Training Leash's 360-degree swivel design carabiner prevents your dog's leash from getting tangled while walking,and the leash is lightweight,soft,and durable enough to be gripped lightly.It does not get tangled easily,even when spinning around other dogs' feet.
• WATERPROOF AND EASY TO CLEAN: The dog leash is easy to wipe down and keep clean.It can be dragged into water and sand while not pooling.It stays dry and odorless even in the wettest conditions,making it suitable for any weather.

Country of Origin: USA
Manufacturer/Importer/Packed By:‎ TOCKFIT

Estimated time of delivery is 15-17 days
Delivery Region :‎ All over India

Product Reviews

No reviews yet Write a Review