null

Lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10Ft 15Ft 30Ft 50Ft For Small Medium Large Dog

Lynxking
No reviews yet Write a Review
MRP: ₹6,804.00
Price: ₹5,233.00
Sale 23%
UPC:
8.32929E+12
In Stock
Availability: Estimated time of delivery is 15-17 days
Current Stock:Only left:

Frequently Bought Together:

Total: Inc. Tax
Total: Ex. Tax

Description

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog

Key Features:
• SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
• NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
• LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.

Country of Origin: USA
Manufacturer/Importer/Packed By:‎ Lynxking

Estimated time of delivery is 15-17 days
Delivery Region :‎ All over India

Product Reviews

No reviews yet Write a Review